[jbosstools-issues] [JBoss JIRA] (JBTIS-6) JBossTools Integration Stack :: BPMN2: Verify the component configuration of the initial IS tooling release.
Robert (Bob) Brodt (JIRA)
jira-events at lists.jboss.org
Wed Jan 23 14:05:47 EST 2013
[ https://issues.jboss.org/browse/JBTIS-6?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Robert (Bob) Brodt reassigned JBTIS-6:
--------------------------------------
Assignee: Paul Leacu (was: Robert (Bob) Brodt)
> JBossTools Integration Stack :: BPMN2: Verify the component configuration of the initial IS tooling release.
> ------------------------------------------------------------------------------------------------------------
>
> Key: JBTIS-6
> URL: https://issues.jboss.org/browse/JBTIS-6
> Project: JBoss Tools Integration Stack
> Issue Type: Sub-task
> Security Level: Public(Everyone can see)
> Components: BPMN2
> Environment: JBT 4.0
> Reporter: Paul Leacu
> Assignee: Paul Leacu
>
> Please verify your component configuration of the JBoss Integration Stack for a JBoss Tools 4.0 target.
> Also check that all components are compatible with the upstream components defined in the target platform.
> ref:
> https://github.com/pleacu/jbosstools-integration-stack-proto/blob/master/aggregate-site/site.xml
> https://github.com/pleacu/jbosstools-integration-stack-proto/blob/master/releases/compositeArtifacts.xml - compositeContent.xml
> https://github.com/pleacu/jbosstools-integration-stack-proto/blob/master/target-platform/integration-tools.target
> I'm working on getting this project promoted to jbosstools in github. Unitl then please refer to/fork the urls above. There is a best-guess already specified for each component.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jbosstools-issues
mailing list