[jbosstools-issues] [JBoss JIRA] (JBIDE-15676) Server Adapter: Pushing and Pulling frequently fails because of timeouts that are far too low.
Andre Dietisheim (JIRA)
jira-events at lists.jboss.org
Tue Oct 15 14:50:35 EDT 2013
Andre Dietisheim created JBIDE-15676:
----------------------------------------
Summary: Server Adapter: Pushing and Pulling frequently fails because of timeouts that are far too low.
Key: JBIDE-15676
URL: https://issues.jboss.org/browse/JBIDE-15676
Project: Tools (JBoss Tools)
Issue Type: Enhancement
Components: openshift
Affects Versions: 4.1.0.Final
Reporter: Andre Dietisheim
Assignee: Andre Dietisheim
Fix For: 4.1.1.Beta1, 4.2.0.Alpha1
Pushing and pulling via the server adapter frequently fails with the server adapter since timeouts are far too low.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jbosstools-issues
mailing list