[jbosstools-issues] [JBoss JIRA] (JBDS-2807) Update jrebel updatesite to use separate url for install feedback

Nick Boldt (JIRA) jira-events at lists.jboss.org
Tue Oct 22 09:51:02 EDT 2013


    [ https://issues.jboss.org/browse/JBDS-2807?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12823977#comment-12823977 ] 

Nick Boldt edited comment on JBDS-2807 at 10/22/13 9:49 AM:
------------------------------------------------------------

PRs merged and disco sites respun. Testing can begin now using these configs for eclipse.ini or jbdevstudio.ini:

{code}
-Djboss.discovery.directory.url=http://download.jboss.org/jbosstools/discovery/nightly/core/4.1.kepler/jbosstools-directory.xml
-Djboss.discovery.site.url=http://download.jboss.org/jbosstools/discovery/nightly/core/4.1.kepler/

-Djboss.discovery.directory.url=http://www.qa.jboss.com/binaries/RHDS/discovery/nightly/core/4.1.kepler/devstudio-directory.xml
-Djboss.discovery.site.url=http://www.qa.jboss.com/binaries/RHDS/discovery/nightly/core/4.1.kepler/
{code}

I was able to install JRebel 5.4.0.RELEASE-C-201309191608 from the new URL within JBDS 7's Central, using the above -D overrides.

How will we know if the new update site for JRebel tracks the download as they expect? I can only verify the site works for performing the installation, but not what happens on their server side.

Once verified this works as expected, I can roll this out to the released JBDS 7.0.x, 6.0.x, and 5.0.x sites.

                
      was (Author: nickboldt):
    PRs merged and disco sites respun. Testing can begin now using these configs for eclipse.ini or jbdevstudio.ini:

{code}
-Djboss.discovery.directory.url=http://download.jboss.org/jbosstools/discovery/nightly/core/4.1.kepler/jbosstools-directory.xml
-Djboss.discovery.site.url=http://download.jboss.org/jbosstools/discovery/nightly/core/4.1.kepler/

-Djboss.discovery.directory.url=http://www.qa.jboss.com/binaries/RHDS/discovery/nightly/core/4.1.kepler/devstudio-directory.xml
-Djboss.discovery.site.url=http://www.qa.jboss.com/binaries/RHDS/discovery/nightly/core/4.1.kepler/
{code}

Once verified this works as expected, I can roll this out to the released JBDS 7.0.x, 6.0.x, and 5.0.x sites.

How will we know if the new update site for JRebel tracks the download as they expect? I can only verify the site works for performing the installation, but not what happens on their server side.
                  
> Update jrebel updatesite to use separate url for install feedback
> -----------------------------------------------------------------
>
>                 Key: JBDS-2807
>                 URL: https://issues.jboss.org/browse/JBDS-2807
>             Project: Developer Studio (JBoss Developer Studio)
>          Issue Type: Task
>      Security Level: Public(Everyone can see) 
>          Components: central, discovery
>            Reporter: Max Rydahl Andersen
>            Assignee: Nick Boldt
>              Labels: respin-a
>             Fix For: 7.1.0.Beta1, 7.1.0.GA
>
>
> jrebel would like to see how many installs central gives and have given us this special url to use in discovery.xml.
> http://update.zeroturnaround.com/update-site-jboss/
> (the / at the end is important)
> We should change this for all active discovery plugins that have jrebel mentioned.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira


More information about the jbosstools-issues mailing list