[jbosstools-issues] [JBoss JIRA] (JBIDE-18919) Weak performance on Software/Update tab features loading
Mickael Istria (JIRA)
issues at jboss.org
Fri Dec 19 17:28:30 EST 2014
[ https://issues.jboss.org/browse/JBIDE-18919?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13029128#comment-13029128 ]
Mickael Istria commented on JBIDE-18919:
----------------------------------------
Most comments in this bug seem to drive to the conclusion that this is not an infrastructure or a download issue, but more an issue in the code itself while comparing state of the application with content of remote repositories.
> Weak performance on Software/Update tab features loading
> --------------------------------------------------------
>
> Key: JBIDE-18919
> URL: https://issues.jboss.org/browse/JBIDE-18919
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: central
> Affects Versions: 4.2.1.CR1
> Reporter: Pavol Srna
> Assignee: Mickael Istria
> Fix For: 4.2.2.Final, 4.3.0.Alpha1
>
>
> It takes about ~1 minute to load content into Software/Update tab in central.
> Some of my colleagues noticed this too.
--
This message was sent by Atlassian JIRA
(v6.3.11#6341)
More information about the jbosstools-issues
mailing list