[jbosstools-issues] [JBoss JIRA] (TOOLSDOC-449) Update explicit 7.1 text and figs references in docs for 8.0

Michelle Murray (JIRA) issues at jboss.org
Sat Feb 8 19:45:30 EST 2014


     [ https://issues.jboss.org/browse/TOOLSDOC-449?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Michelle Murray updated TOOLSDOC-449:
-------------------------------------

    Sprint: 2014/S5-1  (was: 2014/S5)

    
> Update explicit 7.1 text and figs references in docs for 8.0
> ------------------------------------------------------------
>
>                 Key: TOOLSDOC-449
>                 URL: https://issues.jboss.org/browse/TOOLSDOC-449
>             Project: Documentation for JBoss Tools and Developer Studio
>          Issue Type: Task
>      Security Level: Public(Everyone can see) 
>          Components: Getting Started Guide, Installation Guide, Migration Guide, User Guide
>            Reporter: Michelle Murray
>            Assignee: Michelle Murray
>             Fix For: 4.2.0.Beta1
>
>   Original Estimate: 1 day, 30 minutes
>  Remaining Estimate: 1 day, 30 minutes
>
> _Text_
> *Installation Guide*
> 2.2 Supported Operating Systems and Architectures
> 2.3 Computer Memory
> 2.4 Compatible Java Developer Kits
> 3.2 Install JBoss Developer Studio
> 3.3 Install JBoss Developer Studio BYOE
> 5.2 Upgrade from JBoss Developer Studio 6.x and Earlier
> 5.3 Upgrade from JBoss Developer Studio 7.0
> B.1 Build the Universal Installer from Source
> *Getting Started Guide*
> 2.1 About Getting Started
> 3.1 Installation Assumptions
> 3.2 Install JBoss Developer Studio (shared with Install)
> 4.3 Tutorial Assumptions
> *Migration Guide*
> 2.2 Upgrade from JBoss Developer Studio 6.x and Earlier (shared with Install)
> 2.3 Upgrade from JBoss Developer Studio 7.0 (shared with Install)
> 3.1 Change the Version of Eclipse Being Used with JBoss Developer Studio BYOE
> *User Guide*
> --
> _Figures_
> *Installation Guide*
> 3.2 Installation Step 3: Select Target Folder
> 3.3 Installation Step 4: Select Java VM
> 3.5 Installation Step 7: Installation Progress in Finished State
> 3.6 Install JBoss Developer Studio BYOE via Eclipse Marketplace
> 3.7 Confirm Selected Features Window
> 3.10 Work from an Online Website
> 3.11 Work from a Local Copy of the Update .zip file
> 3.12 Availalble Software Window Listing JBoss Developer Studio 7.x - Bring Your Own Eclipse
> *Getting Started Guide*
> 3.2 Installation Step 3: Select Target Folder (shared with Install)
> 3.3 Installation Step 4: Select Java VM (shared with Install)
> 3.4 Installation Step 7: Installation Progress in Finished State (shared with Install)
> *Migration Guide*
> --
> *User Guide*
> 2.4 JBoss Buzz
> 2.22 Work from a Local Copy of the JBoss Central .zip File

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira


More information about the jbosstools-issues mailing list