[jbosstools-issues] [JBoss JIRA] (JBIDE-17526) Improve performance of Central software install UI
Radim Hopp (JIRA)
issues at jboss.org
Fri Jul 18 03:34:30 EDT 2014
[ https://issues.jboss.org/browse/JBIDE-17526?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Radim Hopp closed JBIDE-17526.
------------------------------
Verified in JBT 4.2.0.Beta3a
> Improve performance of Central software install UI
> --------------------------------------------------
>
> Key: JBIDE-17526
> URL: https://issues.jboss.org/browse/JBIDE-17526
> Project: Tools (JBoss Tools)
> Issue Type: Enhancement
> Components: central
> Affects Versions: 4.2.0.Beta2
> Reporter: Martin Malina
> Assignee: Mickael Istria
> Fix For: 4.2.0.Beta3
>
>
> When you try to install something from Central, it takes quite some time before you're shown the install dialog and can actually proceed.
> Mickael in JBIDE-17496:
> {quote}
> Maybe you could open an enhancement request for performances. FYI, with Central as it is in JBDS 7.1.1, you still have to wait for those 5 seconds. However, it just changes cursor and freeze UI, you don't see a progress bar.
> The performance are most likely to be improved (~divided by 2) when things get actually released and fetched from Akamai.
> {quote}
--
This message was sent by Atlassian JIRA
(v6.2.6#6264)
More information about the jbosstools-issues
mailing list