[jbosstools-issues] [JBoss JIRA] (JBIDE-17550) When Install/Update button pressed no progress reported about installation preparation

Fred Bricon (JIRA) issues at jboss.org
Fri Jun 6 06:40:15 EDT 2014


     [ https://issues.jboss.org/browse/JBIDE-17550?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Fred Bricon updated JBIDE-17550:
--------------------------------

    Assignee: Mickael Istria


> When Install/Update button pressed no progress reported about installation preparation
> --------------------------------------------------------------------------------------
>
>                 Key: JBIDE-17550
>                 URL: https://issues.jboss.org/browse/JBIDE-17550
>             Project: Tools (JBoss Tools)
>          Issue Type: Bug
>          Components: central
>    Affects Versions: 4.2.0.Beta2
>            Reporter: Denis Golovin
>            Assignee: Mickael Istria
>             Fix For: 4.2.0.Beta3
>
>
> When big features like ADT or set of features requested to be installed from central there is no indication in eclipse by any means that something is going on. Meantime central calls
> {code}
> computeInstallableUnits(monitor.newChild(50));
> {code}
> and
> {code}resolveInstall(monitor.newChild(50));{code}
> which can take considerable amount of time.
> I think progress for Preparation to install requested features shiould be visible in eclipse.



--
This message was sent by Atlassian JIRA
(v6.2.3#6260)


More information about the jbosstools-issues mailing list