[jbosstools-issues] [JBoss JIRA] (JBIDE-16820) create headless p2 director install job for testing installation of JBT+Central or JBDS+Central
Nick Boldt (JIRA)
issues at jboss.org
Thu Mar 20 23:26:10 EDT 2014
[ https://issues.jboss.org/browse/JBIDE-16820?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12954818#comment-12954818 ]
Nick Boldt edited comment on JBIDE-16820 at 3/20/14 11:25 PM:
--------------------------------------------------------------
TP issues all resolved. Master job installs first JBT then Central, then JBDS then Central.
Second job created: https://jenkins.mw.lab.eng.bos.redhat.com/hudson/job/jbosstools-install-p2director.install-tests.matrix_4.2.luna/
Both jbosstools-install-p2director.install-tests.matrix jobs are now hooked up to run after every rebuild of the Discovery site.
Therefore the sequence is this:
!http://www.gliffy.com/go/publish/image/5510655/L.png!
( http://www.gliffy.com/go/publish/5510655 )
I've also disabled the install-grinder jobs because they're consistently failing w/ "SWT no more handles" and this headless approach Just Works.
was (Author: nickboldt):
TP issues all resolved. Master job installs first JBT then Central, then JBDS then Central.
Second job created: https://jenkins.mw.lab.eng.bos.redhat.com/hudson/job/jbosstools-install-p2director.install-tests.matrix_4.2.luna/
Both jbosstools-install-p2director.install-tests.matrix jobs are now hooked up to run after every rebuild of the Discovery site.
Therefore the sequence is this:
!http://www.gliffy.com/go/publish/image/5510655/L.png!
I've also disabled the install-grinder jobs because they're consistently failing w/ "SWT no more handles" and this headless approach Just Works.
> create headless p2 director install job for testing installation of JBT+Central or JBDS+Central
> -----------------------------------------------------------------------------------------------
>
> Key: JBIDE-16820
> URL: https://issues.jboss.org/browse/JBIDE-16820
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: build, central, discovery, testing-tools
> Affects Versions: 4.2.0.Beta1
> Reporter: Nick Boldt
> Assignee: Nick Boldt
> Fix For: 4.2.0.Beta1
>
>
> Install grinder is great for testing UI-based installation, but for a headless approach, we need something w/o UI.
> Thus, use existing scripts such as
> https://github.com/jbosstools/jbosstools-build-ci/blob/master/util/installAndDisplayCompositeSiteContent.sh
> http://download.jboss.org/jbosstools/updates/scripted-install/director.xml
> to create a new headless matrix job.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira
More information about the jbosstools-issues
mailing list