[jbosstools-issues] [JBoss JIRA] (JBIDE-8427) Really slow deployment while dialog visible

Rob Stryker (JIRA) issues at jboss.org
Thu May 22 13:36:57 EDT 2014


     [ https://issues.jboss.org/browse/JBIDE-8427?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Rob Stryker resolved JBIDE-8427.
--------------------------------

    Resolution: Done


The world cheered, and a 3 year old bug has been resolved. 

> Really slow deployment while dialog visible
> -------------------------------------------
>
>                 Key: JBIDE-8427
>                 URL: https://issues.jboss.org/browse/JBIDE-8427
>             Project: Tools (JBoss Tools)
>          Issue Type: Bug
>          Components: server, upstream
>    Affects Versions: 3.2.0.CR1
>         Environment: Mac OS X 10.6.4, Eclipse 3.6.1 (64 bits)
>            Reporter: henk de boer
>            Assignee: Max Rydahl Andersen
>            Priority: Critical
>              Labels: cocoa, deployment, gui, mac
>             Fix For: 4.2.0.Beta2
>
>
> When a project is deployed using the Jboss tools WTP adapter with the progress dialog visible the operation is really slow. As soon as the operation is send to the background it's fast again.
> It seems the code tries to display every file name on screen, which results in a maximum copy rate of 60 files/second (screen refresh).



--
This message was sent by Atlassian JIRA
(v6.2.3#6260)


More information about the jbosstools-issues mailing list