[jbosstools-issues] [JBoss JIRA] (JBIDE-17471) "Computing connector status" error when installing from central right after start

Fred Bricon (JIRA) issues at jboss.org
Fri May 30 06:11:15 EDT 2014


     [ https://issues.jboss.org/browse/JBIDE-17471?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Fred Bricon resolved JBIDE-17471.
---------------------------------

      Assignee: Fred Bricon  (was: Mickael Istria)
    Resolution: Done


Fixed with https://github.com/jbosstools/jbosstools-central/pull/238 for JBIDE-17463

> "Computing connector status" error when installing from central right after start
> ---------------------------------------------------------------------------------
>
>                 Key: JBIDE-17471
>                 URL: https://issues.jboss.org/browse/JBIDE-17471
>             Project: Tools (JBoss Tools)
>          Issue Type: Bug
>          Components: central
>    Affects Versions: 4.2.0.Beta2
>         Environment: JBDS 8.0.0.Beta2 B104
>            Reporter: Martin Malina
>            Assignee: Fred Bricon
>            Priority: Critical
>              Labels: respin-a
>             Fix For: 4.2.0.Beta2
>
>
> I understand this might overlap with JBIDE-17463 ("Computing connector status" error when closing Central after changing availability Early Access), but it's a bit different.
> If I try to install anything from Central right after JBDS start, the install dialog gets open, but a few seconds later, I get may Computing connector status errors. If I click Details, I can see they are all NPEs.



--
This message was sent by Atlassian JIRA
(v6.2.3#6260)


More information about the jbosstools-issues mailing list