[jbosstools-issues] [JBoss JIRA] (JBIDE-18366) Sometimes, EAP6/WildFly8/AS7 fails to start - Failed initializing module org.jboss.as.logging

Martin Malina (JIRA) issues at jboss.org
Thu Nov 27 08:47:39 EST 2014


    [ https://issues.jboss.org/browse/JBIDE-18366?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13023598#comment-13023598 ] 

Martin Malina commented on JBIDE-18366:
---------------------------------------

FYI, this bug just happened for me in JBDS 8.0.1.CR1 B333 with WildFly 8.2 added using runtime detection (OS X Yosemite, Oracle JDK 1.7.0_67).
{code}
objc[12010]: Class JavaLaunchHelper is implemented in both /Library/Java/JavaVirtualMachines/jdk1.7.0_67.jdk/Contents/Home/bin/java and /Library/Java/JavaVirtualMachines/jdk1.7.0_67.jdk/Contents/Home/jre/lib/libinstrument.dylib. One of the two will be used. Which one is undefined.
WARNING: Failed to load the specified log manager class org.jboss.logmanager.LogManager
XI 27, 2014 2:39:34 ODP. org.jboss.msc.service.ServiceContainerImpl <clinit>
INFO: JBoss MSC version 1.2.2.Final
XI 27, 2014 2:39:34 ODP. org.jboss.as.server.ApplicationServerService start
INFO: JBAS015899: WildFly 8.2.0.Final "Tweek" starting
XI 27, 2014 2:39:35 ODP. org.jboss.as.controller.AbstractOperationContext executeStep
ERROR: JBAS014612: Operation ("parallel-extension-add") failed - address: ([])
java.lang.RuntimeException: JBAS014670: Failed initializing module org.jboss.as.logging
	at org.jboss.as.controller.extension.ParallelExtensionAddHandler$1.execute(ParallelExtensionAddHandler.java:111)
	at org.jboss.as.controller.AbstractOperationContext.executeStep(AbstractOperationContext.java:660)
	at org.jboss.as.controller.AbstractOperationContext.doCompleteStep(AbstractOperationContext.java:501)
	at org.jboss.as.controller.AbstractOperationContext.completeStepInternal(AbstractOperationContext.java:298)
	at org.jboss.as.controller.AbstractOperationContext.executeOperation(AbstractOperationContext.java:293)
	at org.jboss.as.controller.ModelControllerImpl.boot(ModelControllerImpl.java:324)
	at org.jboss.as.controller.AbstractControllerService.boot(AbstractControllerService.java:297)
	at org.jboss.as.server.ServerService.boot(ServerService.java:356)
	at org.jboss.as.server.ServerService.boot(ServerService.java:331)
	at org.jboss.as.controller.AbstractControllerService$1.run(AbstractControllerService.java:259)
	at java.lang.Thread.run(Thread.java:745)
Caused by: java.util.concurrent.ExecutionException: java.lang.IllegalStateException: JBAS011592: The logging subsystem requires the log manager to be org.jboss.logmanager.LogManager. The subsystem has not be initialized and cannot be used. To use JBoss Log Manager you must add the system property "java.util.logging.manager" and set it to "org.jboss.logmanager.LogManager"
	at java.util.concurrent.FutureTask.report(FutureTask.java:122)
	at java.util.concurrent.FutureTask.get(FutureTask.java:188)
	at org.jboss.as.controller.extension.ParallelExtensionAddHandler$1.execute(ParallelExtensionAddHandler.java:103)
	... 10 more
Caused by: java.lang.IllegalStateException: JBAS011592: The logging subsystem requires the log manager to be org.jboss.logmanager.LogManager. The subsystem has not be initialized and cannot be used. To use JBoss Log Manager you must add the system property "java.util.logging.manager" and set it to "org.jboss.logmanager.LogManager"
	at org.jboss.as.logging.LoggingExtension.initialize(LoggingExtension.java:122)
	at org.jboss.as.controller.extension.ExtensionAddHandler.initializeExtension(ExtensionAddHandler.java:98)
	at org.jboss.as.controller.extension.ParallelExtensionAddHandler$ExtensionInitializeTask.call(ParallelExtensionAddHandler.java:139)
	at org.jboss.as.controller.extension.ParallelExtensionAddHandler$ExtensionInitializeTask.call(ParallelExtensionAddHandler.java:125)
	at java.util.concurrent.FutureTask.run(FutureTask.java:262)
	at java.util.concurrent.ThreadPoolExecutor.runWorker(ThreadPoolExecutor.java:1145)
	at java.util.concurrent.ThreadPoolExecutor$Worker.run(ThreadPoolExecutor.java:615)
	at java.lang.Thread.run(Thread.java:745)
	at org.jboss.threads.JBossThread.run(JBossThread.java:122)

XI 27, 2014 2:39:35 ODP. org.jboss.as.server.ServerService boot
FATAL: JBAS015957: Server boot has failed in an unrecoverable manner; exiting. See previous messages for details.
{code}

> Sometimes, EAP6/WildFly8/AS7 fails to start - Failed initializing module org.jboss.as.logging
> ---------------------------------------------------------------------------------------------
>
>                 Key: JBIDE-18366
>                 URL: https://issues.jboss.org/browse/JBIDE-18366
>             Project: Tools (JBoss Tools)
>          Issue Type: Bug
>          Components: server
>    Affects Versions: 4.2.0.CR1
>            Reporter: Martin Malina
>            Assignee: Rob Stryker
>             Fix For: 4.2.1.Final, 4.3.0.Alpha1
>
>
> Sometimes, right after start of the IDE, a server fails to start. When this happens, it produces something like this in the server log:
> {code}
> INFO: JBoss MSC version 1.1.5.Final-redhat-1
> Sep 17, 2014 11:27:40 AM org.jboss.as.server.ApplicationServerService start
> INFO: JBAS015899: JBoss EAP 6.3.0.GA (AS 7.4.0.Final-redhat-19) starting
> Sep 17, 2014 11:27:40 AM org.jboss.as.controller.AbstractOperationContext executeStep
> ERROR: JBAS014612: Operation ("parallel-extension-add") failed - address: ([])
> java.lang.RuntimeException: JBAS014670: Failed initializing module org.jboss.as.logging
>         at org.jboss.as.controller.extension.ParallelExtensionAddHandler$1.execute(ParallelExtensionAddHandler.java:111)
>         at org.jboss.as.controller.AbstractOperationContext.executeStep(AbstractOperationContext.java:611)
>         at org.jboss.as.controller.AbstractOperationContext.doCompleteStep(AbstractOperationContext.java:489)
>         at org.jboss.as.controller.AbstractOperationContext.completeStepInternal(AbstractOperationContext.java:290)
>         at org.jboss.as.controller.AbstractOperationContext.executeOperation(AbstractOperationContext.java:285)
>         at org.jboss.as.controller.OperationContextImpl.executeOperation(OperationContextImpl.java:1132)
>         at org.jboss.as.controller.ModelControllerImpl.boot(ModelControllerImpl.java:299)
>         at org.jboss.as.controller.AbstractControllerService.boot(AbstractControllerService.java:292)
>         at org.jboss.as.server.ServerService.boot(ServerService.java:346)
>         at org.jboss.as.server.ServerService.boot(ServerService.java:321)
>         at org.jboss.as.controller.AbstractControllerService$1.run(AbstractControllerService.java:254)
>         at java.lang.Thread.run(Thread.java:695)
> Caused by: java.util.concurrent.ExecutionException: java.lang.IllegalStateException: JBAS011592: The logging subsystem requires the log manager to be org.jboss.logmanager.LogManager. The subsystem has not be initialized and cannot be used. To use JBoss Log Manager you must add the system property "java.util.logging.manager" and set it to "org.jboss.logmanager.LogManager"
>         at java.util.concurrent.FutureTask$Sync.innerGet(FutureTask.java:222)
>         at java.util.concurrent.FutureTask.get(FutureTask.java:83)
>         at org.jboss.as.controller.extension.ParallelExtensionAddHandler$1.execute(ParallelExtensionAddHandler.java:103)
>         ... 11 more
> Caused by: java.lang.IllegalStateException: JBAS011592: The logging subsystem requires the log manager to be org.jboss.logmanager.LogManager. The subsystem has not be initialized and cannot be used. To use JBoss Log Manager you must add the system property "java.util.logging.manager" and set it to "org.jboss.logmanager.LogManager"
>         at org.jboss.as.logging.LoggingExtension.initialize(LoggingExtension.java:106)
>         at org.jboss.as.controller.extension.ExtensionAddHandler.initializeExtension(ExtensionAddHandler.java:97)
>         at org.jboss.as.controller.extension.ParallelExtensionAddHandler$ExtensionInitializeTask.call(ParallelExtensionAddHandler.java:139)
>         at org.jboss.as.controller.extension.ParallelExtensionAddHandler$ExtensionInitializeTask.call(ParallelExtensionAddHandler.java:125)
>         at java.util.concurrent.FutureTask$Sync.innerRun(FutureTask.java:303)
>         at java.util.concurrent.FutureTask.run(FutureTask.java:138)
>         at java.util.concurrent.ThreadPoolExecutor$Worker.runTask(ThreadPoolExecutor.java:895)
>         at java.util.concurrent.ThreadPoolExecutor$Worker.run(ThreadPoolExecutor.java:918)
>         at java.lang.Thread.run(Thread.java:695)
>         at org.jboss.threads.JBossThread.run(JBossThread.java:122)
> Sep 17, 2014 11:27:40 AM org.jboss.as.server.ServerService boot
> FATAL: JBAS015957: Server boot has failed in an unrecoverable manner; exiting. See previous messages for details.
> {code}
> Unfortunately I don't have a reliable way to reproduce this. It happened to me like 3 times over the last few days.



--
This message was sent by Atlassian JIRA
(v6.3.8#6338)


More information about the jbosstools-issues mailing list