[jbosstools-issues] [JBoss JIRA] (JBIDE-18662) use getProjectSHAs.sh to control when to run aggregate builds, instead of doing composite site installs
Nick Boldt (JIRA)
issues at jboss.org
Fri Oct 17 14:58:34 EDT 2014
Nick Boldt created JBIDE-18662:
----------------------------------
Summary: use getProjectSHAs.sh to control when to run aggregate builds, instead of doing composite site installs
Key: JBIDE-18662
URL: https://issues.jboss.org/browse/JBIDE-18662
Project: Tools (JBoss Tools)
Issue Type: Bug
Components: build
Affects Versions: 4.2.0.CR2
Reporter: Nick Boldt
Nick said:
>> How else would you determine if/when the aggregates should be built?
>> Using a variation on getProjectSHAs.sh script and diffing the last run
>> w/ the current run? Or something else?
And Mickael replied:
> It could be built as often as the composite-install job runs because it
> takes more or less the same time, and even if one builds aggregator for
> nothing, it won't change the aggregate repository output (only the
> content.jar and artifact.jar would be updated to a newer timestamp).
> So since it's totally possible directly aggregate whenever something
> changes for the same price, it seems more straightforward to do it
> instead of introducing an intermediary control job, which can have bugs.
Then Nick said:
Yeah, I still like the fact that the composite install job performs an install test... but maybe it can be downstream of the TP change and NOT upstream of the aggregate builds?
I could look at creating a more "diffable digest" as output of getProjectSHAs.sh and have that run in Jenkins as the gatekeeper (or keymaster?) for when to run aggregates.
--
This message was sent by Atlassian JIRA
(v6.3.1#6329)
More information about the jbosstools-issues
mailing list