[jbosstools-issues] [JBoss JIRA] (JBIDE-17268) Forge wizards block eclipse UI while executing - need to be stoppable/canceble

Pavol Srna (JIRA) issues at jboss.org
Tue Sep 2 10:04:00 EDT 2014


     [ https://issues.jboss.org/browse/JBIDE-17268?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Pavol Srna closed JBIDE-17268.
------------------------------


Verified in JBT 4.2.0.CR1 build.

> Forge wizards block eclipse UI while executing - need to be stoppable/canceble
> ------------------------------------------------------------------------------
>
>                 Key: JBIDE-17268
>                 URL: https://issues.jboss.org/browse/JBIDE-17268
>             Project: Tools (JBoss Tools)
>          Issue Type: Feature Request
>          Components: forge
>    Affects Versions: 4.2.0.Beta1
>            Reporter: Lincoln Baxter III
>            Assignee: George Gastaldi
>            Priority: Critical
>             Fix For: 4.2.0.CR1
>
>
> Forge wizards currently can block the eclipse UI. Run any non-trivial command and the Eclipse interface will be completely blocked until the forge command is cancelled, which may not be possible if the command is not using a fine-grained progress monitor and checks frequently.
> Introducing a threaded command execution would allow the use of {code}commandThread.interrupt(){code}
> And should allow both backgrounding of running wizards, but also more reliable cancellation with Forge's proxy support for thread interrupt handling.
> Alternative is to:
> provide method to cancel progress.
> on first try cancel if command is "CanCancel" then use progress monitor cancel, if not use thread.interrupt() that will stop the progress on proxy boundaries.



--
This message was sent by Atlassian JIRA
(v6.3.1#6329)


More information about the jbosstools-issues mailing list