[jbosstools-issues] [JBoss JIRA] (JBIDE-20453) Instead of 4 zips, merge Central+TP and EA+TP into 2 composite repos for easier offline use (similar to what we had for JBDS 8)
Max Rydahl Andersen (JIRA)
issues at jboss.org
Mon Aug 17 05:48:26 EDT 2015
[ https://issues.jboss.org/browse/JBIDE-20453?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13098809#comment-13098809 ]
Max Rydahl Andersen commented on JBIDE-20453:
---------------------------------------------
[~nickboldt] your last comment ends with:
{quote}
Thus:
https://devstudio.redhat.com/9.0/snapshots/updates/
https://devstudio.redhat.com/9.0/staging/updates/
https://devstudio.redhat.com/9.0/development/updates/ (TODO left for when we're releasing CR1)
{quote}
which I assume implies this is where I should go look and see the result of this now resolved jira but I still see 4 different zips here so not sure what the actual suggested result is ?
Should it not just be main tools updatesite.zip (which is our components + Central + TP) and then *one* zip download for Earlyaccess (which you probably view as EA+ additional TP) ?
Or do you really imply that we will duplicate the same TP into both Earlyaccess and Central ?
Is that really necessary ?
> Instead of 4 zips, merge Central+TP and EA+TP into 2 composite repos for easier offline use (similar to what we had for JBDS 8)
> -------------------------------------------------------------------------------------------------------------------------------
>
> Key: JBIDE-20453
> URL: https://issues.jboss.org/browse/JBIDE-20453
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: build, central, updatesite
> Affects Versions: 4.3.0.Beta2
> Reporter: Nick Boldt
> Assignee: Nick Boldt
> Priority: Blocker
> Fix For: 4.3.0.CR1
>
>
> Today the offline solution [1], [2] for installing stuff from Central or Early Access requires a pair of zips: the 3rd party content (target platform), and the stuff from JBoss Tools.
> [1] http://www.jboss.org/products/devstudio/download/ (Central Zip doesn't include the JBT stuff, just the 3rd party / TP content)
> [2] https://devstudio.redhat.com/9.0/staging/updates/ (both zips shown)
> We should combine these into a single, larger zip, such that the offline solution requires only a single zip and there's no confusion about what a Central Zip is.
--
This message was sent by Atlassian JIRA
(v6.3.15#6346)
More information about the jbosstools-issues
mailing list