[jbosstools-issues] [JBoss JIRA] (JBIDE-20343) Processing easymport cannot be stopped in reasonable time
Mickael Istria (JIRA)
issues at jboss.org
Mon Aug 31 07:22:05 EDT 2015
[ https://issues.jboss.org/browse/JBIDE-20343?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13103555#comment-13103555 ]
Mickael Istria commented on JBIDE-20343:
----------------------------------------
[~fbricon] I went into more details, and here is what I think is the issue with this job: it is a workspace job (that locks workspace changes) in which one the download of dependencies happen for some time. A better approach would be to resolve dependencies in one job, and then to update project in the WorkspaceJob (if even necessary).
Should I open a Bugzilla ticket for that?
> Processing easymport cannot be stopped in reasonable time
> ---------------------------------------------------------
>
> Key: JBIDE-20343
> URL: https://issues.jboss.org/browse/JBIDE-20343
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: easymport
> Affects Versions: 4.3.0.Beta2
> Environment: JBDS 9.0.0.Beta2, L64
> Reporter: Jiri Peterka
> Assignee: Mickael Istria
> Fix For: 4.3.0.CR1
>
>
> During Easyimport operation it's unable to stop it. There is red stop box but it doesn't do anything in reasonable time.
--
This message was sent by Atlassian JIRA
(v6.3.15#6346)
More information about the jbosstools-issues
mailing list