[jbosstools-issues] [JBoss JIRA] (JBIDE-19017) Prepare for 4.2.2.Final release
Nick Boldt (JIRA)
issues at jboss.org
Fri Jan 9 10:18:30 EST 2015
[ https://issues.jboss.org/browse/JBIDE-19017?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13031346#comment-13031346 ]
Nick Boldt commented on JBIDE-19017:
------------------------------------
PR merged (including a fix in https://github.com/jbdevstudio/jbdevstudio-product/pull/257 ); also pushed to master.
I've disabled the JBT component jobs, the composite and the aggregates, so all that's still turned on are the test jobs (install-grinder (red), versionwatch (yellow), install-p2director (blue) and the product job, which is spinning now.
https://jenkins.mw.lab.eng.bos.redhat.com/hudson/view/DevStudio/view/DevStudio_8.0.luna/job/devstudio.product_8.0.luna/370/
> Prepare for 4.2.2.Final release
> -------------------------------
>
> Key: JBIDE-19017
> URL: https://issues.jboss.org/browse/JBIDE-19017
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: build
> Affects Versions: 4.2.2.Final
> Reporter: Nick Boldt
> Assignee: Mickael Istria
> Priority: Blocker
> Fix For: 4.2.2.Final
>
>
> TODOs for preparing for the 4.2.2 release.
> For components that contribute to this release (and only these): Central, WS, Forge, JBT aggregates, JBDS:
> a) ensure we're all using the right TP (4.40.0.Final, 4.41.1.Final) & parent pom version 4.2.1.Final-SNAPSHOT - NO CHANGE SINCE 4.2.1 release; all projects OK
> b) ensure components have properly upversioned to 4.2.2/8.0.2, etc.
--
This message was sent by Atlassian JIRA
(v6.3.11#6341)
More information about the jbosstools-issues
mailing list