[jbosstools-issues] [JBoss JIRA] (JBIDE-19017) Prepare for 4.2.2.Final release

Nick Boldt (JIRA) issues at jboss.org
Fri Jan 9 10:20:30 EST 2015


    [ https://issues.jboss.org/browse/JBIDE-19017?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13031346#comment-13031346 ] 

Nick Boldt edited comment on JBIDE-19017 at 1/9/15 10:19 AM:
-------------------------------------------------------------

PR merged (including a fix in  https://github.com/jbdevstudio/jbdevstudio-product/pull/257 ); also pushed to master.

I've disabled the JBT component jobs, the composite and the aggregates, so all that's still turned on are the test jobs (install-grinder (red), versionwatch (yellow*), install-p2director (blue) and the product job, which is spinning now.

https://jenkins.mw.lab.eng.bos.redhat.com/hudson/view/DevStudio/view/DevStudio_8.0.luna/job/devstudio.product_8.0.luna/370/

Job is yellow because of these version problems:
{quote}
 Multiple Version issue
javax.wsdl_1.5.1.v201012040544 - ignored, known issue
org.apache.commons.logging_1.0.4.v201101211617 - ignored, known issue
org.eclipse.jdt.annotation_2.0.0.v20140415-1436 
{quote}


was (Author: nickboldt):
PR merged (including a fix in  https://github.com/jbdevstudio/jbdevstudio-product/pull/257 ); also pushed to master.

I've disabled the JBT component jobs, the composite and the aggregates, so all that's still turned on are the test jobs (install-grinder (red), versionwatch (yellow), install-p2director (blue) and the product job, which is spinning now.

https://jenkins.mw.lab.eng.bos.redhat.com/hudson/view/DevStudio/view/DevStudio_8.0.luna/job/devstudio.product_8.0.luna/370/

> Prepare for 4.2.2.Final release
> -------------------------------
>
>                 Key: JBIDE-19017
>                 URL: https://issues.jboss.org/browse/JBIDE-19017
>             Project: Tools (JBoss Tools)
>          Issue Type: Bug
>          Components: build
>    Affects Versions: 4.2.2.Final
>            Reporter: Nick Boldt
>            Assignee: Mickael Istria
>            Priority: Blocker
>             Fix For: 4.2.2.Final
>
>
> TODOs for preparing for the 4.2.2 release.
> For components that contribute to this release (and only these): Central, WS, Forge, JBT aggregates, JBDS:
> a) ensure we're all using the right TP (4.40.0.Final, 4.41.1.Final) & parent pom version 4.2.1.Final-SNAPSHOT - NO CHANGE SINCE 4.2.1 release; all projects OK
> b) ensure components have properly upversioned to 4.2.2/8.0.2, etc.



--
This message was sent by Atlassian JIRA
(v6.3.11#6341)


More information about the jbosstools-issues mailing list