[jbosstools-issues] [JBoss JIRA] (JBTIS-508) integration stacks updatsesites mixes discovery and earlyaccess causing inconsistent update mechanis,
Max Rydahl Andersen (JIRA)
issues at jboss.org
Thu Sep 24 16:08:00 EDT 2015
Max Rydahl Andersen created JBTIS-508:
-----------------------------------------
Summary: integration stacks updatsesites mixes discovery and earlyaccess causing inconsistent update mechanis,
Key: JBTIS-508
URL: https://issues.jboss.org/browse/JBTIS-508
Project: JBoss Tools Integration Stack
Issue Type: Bug
Components: releng
Reporter: Max Rydahl Andersen
Priority: Blocker
While reviewing JBIDE-20803 I noticed the following:
{code]
jboss.discovery.site.integration-stack.url|jbosstools|4.2.4=http://download.jboss.org/jbosstools/discovery/stable/integration-stack/
{code}
The stable release for 4.2.4 is stated to point to the stable integration stack url which on surface looks good:
But there are a few problems:
1) why not just point to http://download.jboss.org/jbosstools/updates/stable/luna/ and have the above internal detail url composited in ?
2) the actual composite behind it right now is http://download.jboss.org/jbosstools/discovery/stable/integration-stack/4.2.3.Final/compositeContent.xml which links in http://download.jboss.org/jbosstools/discovery/stable/integration-stack/4.2.3.Final/compositeContent.xml (our main sites should never composite earlyaccees since then when users install supported versions they suddenly will now also have access to earlyaccess.
#1 is mainly just to reduce the number of updatesites actually necessary for users to work with
#2 seems to be something inherent broken in the IS build since earlyaccess shold *never* be aggregated into the release site.
Any earlyaccess connectors should explicitly point to a *separate* earlyaccess site.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
More information about the jbosstools-issues
mailing list