[jbosstools-issues] [JBoss JIRA] (JBDS-3866) vagrant up failed due to rsync error, eclipse tooling confused about state of cdk server

Robert Terzi (JIRA) issues at jboss.org
Wed Apr 27 16:02:00 EDT 2016


Robert Terzi created JBDS-3866:
----------------------------------

             Summary: vagrant up failed due to rsync error, eclipse tooling confused about state of cdk server
                 Key: JBDS-3866
                 URL: https://issues.jboss.org/browse/JBDS-3866
             Project: Developer Studio (JBoss Developer Studio)
          Issue Type: Bug
          Components: cdk
    Affects Versions: 9.1.0.Beta1
         Environment: Windows 7/64 bit.
(previous installs of CDK and dependencies)
            Reporter: Robert Terzi


vagrant up through the CDK server tooling failed because of an rsync problem.  The tooling lost track of the state of the vagrant box.  The vagrant box couldn't be stopped from inside of Eclipse.

The vagrant up failed because of an error with rsync.  Something was confused about the user's home directory.  It was trying to write to /home/username/.ssh, however, $HOME isn't /home/username, it's /cygdrive/c/Users/username, so /home/username/ doesn't exist. 

The CDK server was shown as 'Started, Sychronized'.   

The error message appeared in the server console tab.  However the stop button wouldn't work. Provisioning had never finished so the OpenShift connection wasn't working either.

Synchronized seems misleading here, since no files had been sync'd yet.





--
This message was sent by Atlassian JIRA
(v6.4.11#64026)


More information about the jbosstools-issues mailing list