[jbosstools-issues] [JBoss JIRA] (JBDS-3985) Modify installation progress bar to include supplemental runtimes
Paul Leacu (JIRA)
issues at jboss.org
Wed Aug 3 16:32:00 EDT 2016
[ https://issues.jboss.org/browse/JBDS-3985?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13274755#comment-13274755 ]
Paul Leacu edited comment on JBDS-3985 at 8/3/16 4:31 PM:
----------------------------------------------------------
Added a new installation progress step - there will be +1 if the runtime is specified (i.e. 4) as occurs with EAP. No change if no runtime is specified. See PR:
https://github.com/jbdevstudio/jbdevstudio-product/pull/391
[~dgolovin1] [~akazakov] ^^
ref: http://download.jboss.org/jbosstools/neon/staging/updates/integration-stack/proto/devstudio-is-runtime-installer-10.0.0-SNAPSHOT.jar
was (Author: pleacu):
Added a new installation progress step - there will be +1 if the runtime is specified (i.e. 4) as occurs with EAP. No change if no runtime is specified. See PR:
https://github.com/jbdevstudio/jbdevstudio-product/pull/391
[~dgolovin1] [~akazakov] ^^
> Modify installation progress bar to include supplemental runtimes
> -----------------------------------------------------------------
>
> Key: JBDS-3985
> URL: https://issues.jboss.org/browse/JBDS-3985
> Project: Red Hat JBoss Developer Studio (devstudio)
> Issue Type: Bug
> Components: installer
> Affects Versions: 10.1.0.AM1
> Reporter: Paul Leacu
> Assignee: Paul Leacu
> Priority: Minor
> Attachments: x1.png, x2.png
>
>
> At install time, if an additional runtime is specified it does not appear in the overall progress bar.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
More information about the jbosstools-issues
mailing list