[jbosstools-issues] [JBoss JIRA] (JBIDE-23566) Include integration-tests (add new update site zip) in staging and stable update sites
Nick Boldt (JIRA)
issues at jboss.org
Fri Dec 2 08:57:00 EST 2016
[ https://issues.jboss.org/browse/JBIDE-23566?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Nick Boldt resolved JBIDE-23566.
--------------------------------
Resolution: Done
As the PR was applied in master only, this is therefore fixed in 4.4.3.AM1 and can be verified when we stage that for QE using the https://jenkins.mw.lab.eng.bos.redhat.com/hudson/view/DevStudio/view/jbosstools-releng/job/jbosstools-releng-push-to-staging-03-verify-builds-update-sites/ job in 3 weeks.
> Include integration-tests (add new update site zip) in staging and stable update sites
> --------------------------------------------------------------------------------------
>
> Key: JBIDE-23566
> URL: https://issues.jboss.org/browse/JBIDE-23566
> Project: Tools (JBoss Tools)
> Issue Type: Feature Request
> Components: updatesite
> Affects Versions: 4.4.2.AM2
> Reporter: Martin Malina
> Assignee: Nick Boldt
> Fix For: 4.4.3.AM1
>
>
> Cloned from JBIDE-23384 to add the integration-tests ZIP file to the staging/stable sites.
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
More information about the jbosstools-issues
mailing list