[jbosstools-issues] [JBoss JIRA] (JBTIS-1002) Progress bar still indicates that the installation is in progress even if it is done

Paul Leacu (JIRA) issues at jboss.org
Thu Dec 8 10:59:00 EST 2016


     [ https://issues.jboss.org/browse/JBTIS-1002?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Paul Leacu reassigned JBTIS-1002:
---------------------------------

    Assignee: Paul Leacu


> Progress bar still indicates that the installation is in progress even if it is done
> ------------------------------------------------------------------------------------
>
>                 Key: JBTIS-1002
>                 URL: https://issues.jboss.org/browse/JBTIS-1002
>             Project: JBoss Tools Integration Stack
>          Issue Type: Bug
>          Components: distribution
>         Environment: devstudio-is-fuse-runtime-installer-10.1.1-SNAPSHOT.jar
>            Reporter: Andrej Podhradsky
>            Assignee: Paul Leacu
>         Attachments: installer_progress.png
>
>
> Progress bar still indicates that the installation is in progress even if it is done. Please see the attached screenshot and notice that the button 'Next' is enabled (the installation is done).



--
This message was sent by Atlassian JIRA
(v7.2.3#72005)


More information about the jbosstools-issues mailing list