[jbosstools-issues] [JBoss JIRA] (JBIDE-21622) Timeout of starting CDK should be longer by default

Martin Malina (JIRA) issues at jboss.org
Tue Feb 2 11:38:00 EST 2016


    [ https://issues.jboss.org/browse/JBIDE-21622?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13157838#comment-13157838 ] 

Martin Malina edited comment on JBIDE-21622 at 2/2/16 11:37 AM:
----------------------------------------------------------------

Looks like a duplicate of JBIDE-21293 . And at the time people argued that this use case should never happen when this will be released - the vagrant box will never be downloaded when starting from Eclipse, it should always be downloaded beforehand - either when you install PDK, or when you install CDK.


was (Author: mmalina):
Looks like a duplicate of JBIDE-21293

> Timeout of starting CDK should be longer by default
> ---------------------------------------------------
>
>                 Key: JBIDE-21622
>                 URL: https://issues.jboss.org/browse/JBIDE-21622
>             Project: Tools (JBoss Tools)
>          Issue Type: Bug
>          Components: cdk
>    Affects Versions: 4.3.1.CR1
>            Reporter: Marián Labuda
>            Assignee: Rob Stryker
>             Fix For: 4.3.1.CR1
>
>         Attachments: cdk_vagrant_halt.png
>
>
> When I am creating a new CDK adapter in tooling, it is stopped after 450 second. Although there were no errors. My creating and starting of CDK took so long because it was downloading CDK image really slow. Timeout should be higher by default.
> !cdk_vagrant_halt.png!



--
This message was sent by Atlassian JIRA
(v6.4.11#64026)



More information about the jbosstools-issues mailing list