[jbosstools-issues] [JBoss JIRA] (JBIDE-21406) Create and use Mars.2 RC1 target platform
Martin Malina (JIRA)
issues at jboss.org
Wed Feb 3 07:51:00 EST 2016
[ https://issues.jboss.org/browse/JBIDE-21406?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Martin Malina closed JBIDE-21406.
---------------------------------
Closing.
> Create and use Mars.2 RC1 target platform
> -----------------------------------------
>
> Key: JBIDE-21406
> URL: https://issues.jboss.org/browse/JBIDE-21406
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: build, target-platform
> Affects Versions: 4.3.1.Beta1
> Reporter: Nick Boldt
> Assignee: Nick Boldt
> Priority: Blocker
> Labels: respin-a
> Fix For: 4.3.1.Beta2
>
> Attachments: jbds-tp-p2diff-450-summary.txt, jbds-tp-p2diff-450.txt, jbds-tp-p2diff-summary.txt, jbds-tp-p2diff.txt, jbt-tp-p2diff-450-summary.txt, jbt-tp-p2diff-450.txt, jbt-tp-p2diff-summary.txt, jbt-tp-p2diff.txt, jbtcentral-p2diff-summary.txt, jbtcentral-p2diff.txt, p2diff.egit.summary.txt, rc1-rc1a.p2diff-filtered.txt, rc1-rc1a.p2diff.txt, too-many-osgi.png
>
>
> Prepare new 4.52.x TPs to use Mars.2 bits.
> https://wiki.eclipse.org/index.php?title=Mars/Simultaneous_Release_Plan#Mars.2
> First RC1 bits should be available on Jan 20 (4.3.1.Beta2 TP freeze day), with EPP bundles needed for install tests on Jan 21 (code freeze day).
> Story points: 21 (fibonacci)
> * jbt tp,
> * jbds tp,
> * central tp;
> * jbt-build-sites,
> * jbds site build
> * update install/matrix jobs to use new Eclipse JEE/platform binary
> * mailing list announcements
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
More information about the jbosstools-issues
mailing list