[jbosstools-issues] [JBoss JIRA] (JBIDE-21100) start process of WildFly-8.2.0-Final never finish (Starting, Synchronized)

carl zhang (JIRA) issues at jboss.org
Tue Feb 16 13:25:00 EST 2016


    [ https://issues.jboss.org/browse/JBIDE-21100?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13163862#comment-13163862 ] 

carl zhang commented on JBIDE-21100:
------------------------------------

Sorry. I remembered I ever replied an email about this. 
I found the problem and fixed. The problem is that somehow the "Server Location" option in server's overview (double click the server name) is changed. I changed back. It works

> start process of WildFly-8.2.0-Final never finish (Starting, Synchronized) 
> ---------------------------------------------------------------------------
>
>                 Key: JBIDE-21100
>                 URL: https://issues.jboss.org/browse/JBIDE-21100
>             Project: Tools (JBoss Tools)
>          Issue Type: Bug
>          Components: server
>         Environment: start process of WildFly-8.2.0-Final never finish (Starting, Synchronized) 
>            Reporter: carl zhang
>            Assignee: Rob Stryker
>             Fix For: 4.4.0.Alpha1
>
>
> please refer to
>    https://developer.jboss.org/thread/265726?start=0&tstart=0
> refer to the picture of 28-Oct-2015 9:46 AM (layer 3)
>    In the left panel: WildFly 8.x is configured to connect to localhost
>                               WildFly 8.x(1) is configured to connect to remote host (Linux)
>   The localhost cannot finish start process. WildFly 8.x(1) (remote) can.
> What ports, or temp files, or anything else are checked when changing from starting to started state?



--
This message was sent by Atlassian JIRA
(v6.4.11#64026)


More information about the jbosstools-issues mailing list