carl zhang commented on JBIDE-21100:
------------------------------------
Sorry. I remembered I ever replied an email about this.
I found the problem and fixed. The problem is that somehow the "Server Location" option in server's overview (double click the server name) is changed. I changed back. It works
> start process of WildFly-8.2.0-Final never finish (Starting, Synchronized)
> ---------------------------------------------------------------------------
>
> Key: JBIDE-21100
> URL: https://issues.jboss.org/browse/JBIDE-21100
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: server
> Environment: start process of WildFly-8.2.0-Final never finish (Starting, Synchronized)
> Reporter: carl zhang
> Assignee: Rob Stryker
> Fix For: 4.4.0.Alpha1
>
>
> please refer to
> https://developer.jboss.org/thread/265726?start=0&tstart=0
> refer to the picture of 28-Oct-2015 9:46 AM (layer 3)
> In the left panel: WildFly 8.x is configured to connect to localhost
> WildFly 8.x(1) is configured to connect to remote host (Linux)
> The localhost cannot finish start process. WildFly 8.x(1) (remote) can.
> What ports, or temp files, or anything else are checked when changing from starting to started state?
--