[jbosstools-issues] [JBoss JIRA] (JBDS-3961) CDK installation failed with progress bar stuck in 99%
Budh Ram Gurung (JIRA)
issues at jboss.org
Fri Jul 15 02:57:00 EDT 2016
[ https://issues.jboss.org/browse/JBDS-3961?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13266037#comment-13266037 ]
Budh Ram Gurung commented on JBDS-3961:
---------------------------------------
[~dgolovin] One more observation is in-spite of having virtualbox already installed and skipped through installation GUI since it was auto detected, I was getting error of "virtualbox.exe not found" while starting server.
On re-installing the virtualbox fixed it.
> CDK installation failed with progress bar stuck in 99%
> ------------------------------------------------------
>
> Key: JBDS-3961
> URL: https://issues.jboss.org/browse/JBDS-3961
> Project: Red Hat JBoss Developer Studio (devstudio)
> Issue Type: Bug
> Components: platform-installer
> Environment: h3. Operating System:
> Windows 10 Pro 64 Bit
> h3. Devstudio version
> Devstudio 1.0 GA
> Reporter: Budh Ram Gurung
> Assignee: Denis Golovin
> Labels: cdk
> Fix For: 10.1.0.AM2
>
> Attachments: dev_studio_installation.PNG, install.log
>
>
> I was trying the "devstudio 1.0 GA build" ("development-suite-1.0.0-GA-bundle-installer.exe") and unable to get CDK installation after gone through the steps of authentication, vagrant, cygwin, jboss dev studio installations.
> Observations:
> CDK installation stuck in 99% with "failed" mark.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
More information about the jbosstools-issues
mailing list