[jbosstools-issues] [JBoss JIRA] (JBDS-3961) CDK installation failed with progress bar stuck in 99%

Jan Richter (JIRA) issues at jboss.org
Mon Jul 25 04:25:02 EDT 2016


     [ https://issues.jboss.org/browse/JBDS-3961?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Jan Richter updated JBDS-3961:
------------------------------
    Priority: Blocker  (was: Major)


> CDK installation failed with progress bar stuck in 99%
> ------------------------------------------------------
>
>                 Key: JBDS-3961
>                 URL: https://issues.jboss.org/browse/JBDS-3961
>             Project: Red Hat JBoss Developer Studio (devstudio)
>          Issue Type: Bug
>          Components: platform-installer
>    Affects Versions: 10.1.0.AM2
>         Environment: h3. Operating System:
> Windows 10 Pro 64 Bit
> h3. Devstudio version 
> Devstudio 1.0 GA
>            Reporter: Budh Ram Gurung
>            Assignee: Denis Golovin
>            Priority: Blocker
>              Labels: cdk
>         Attachments: dev_studio_installation.PNG, install.log
>
>
> I was trying the "devstudio 1.0 GA build" ("development-suite-1.0.0-GA-bundle-installer.exe") and unable to get CDK installation after gone through the steps of authentication, vagrant, cygwin, jboss dev studio installations.
> Observations:
> CDK installation stuck in 99% with "failed" mark.



--
This message was sent by Atlassian JIRA
(v6.4.11#64026)


More information about the jbosstools-issues mailing list