[jbosstools-issues] [JBoss JIRA] (JBIDE-18224) Table Selection has poor performance if "Verify Database Connection" is checked in previous step

Pavol Srna (JIRA) issues at jboss.org
Tue Jun 7 04:58:00 EDT 2016


     [ https://issues.jboss.org/browse/JBIDE-18224?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Pavol Srna closed JBIDE-18224.
------------------------------


Verified in JBT 4.4.0.Final

> Table Selection has poor performance if "Verify Database Connection" is checked in previous step
> ------------------------------------------------------------------------------------------------
>
>                 Key: JBIDE-18224
>                 URL: https://issues.jboss.org/browse/JBIDE-18224
>             Project: Tools (JBoss Tools)
>          Issue Type: Bug
>          Components: forge
>    Affects Versions: 4.2.0.CR1
>            Reporter: Pavol Srna
>            Assignee: George Gastaldi
>            Priority: Critical
>             Fix For: 4.4.0.Final
>
>
> If the "Verify Database Connection" *is checked* then there is very *poor performance* in the next step during tables selection on JPA: Generate Entities From Tables wizard.
> I don't understand what is going on behind the scenes - but there is for sure some communication with DB happening. Not sure if this is necessary as the list of tables is read correctly and imho the list should be just checked if there is at least one table selected. 
> It works *without performance problems* if "Verify Database Connection" was *not checked* in previous step.



--
This message was sent by Atlassian JIRA
(v6.4.11#64026)


More information about the jbosstools-issues mailing list