[jbosstools-issues] [JBoss JIRA] (JBIDE-22501) CDK stuck on Starting... after launch

Rob Stryker (JIRA) issues at jboss.org
Thu Jun 9 18:48:00 EDT 2016


    [ https://issues.jboss.org/browse/JBIDE-22501?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13250599#comment-13250599 ] 

Rob Stryker commented on JBIDE-22501:
-------------------------------------

[~mmalina] I really haven't seen it :(   I've been over the code a number of times and haven't seen anything.  I vaguely recall the poller not being fired on some occasion, but I think that might have not been cdk and was other server adapters. So really I don't know. 

Things that *could* cause such a problem are either the poller not being launched, or the poller not working as expected  (such as running vagrant global-status and getting an error, or incorrectly parsing the output), but the code seems to handle these cases properly and as expected. 

I'm going to close this issue for now, but I'll remember it this time in case I see something similar. 

> CDK stuck on Starting... after launch
> -------------------------------------
>
>                 Key: JBIDE-22501
>                 URL: https://issues.jboss.org/browse/JBIDE-22501
>             Project: Tools (JBoss Tools)
>          Issue Type: Bug
>          Components: cdk
>    Affects Versions: 4.4.0.Alpha2
>            Reporter: Martin Malina
>            Assignee: Rob Stryker
>            Priority: Critical
>             Fix For: 4.4.0.Final
>
>
> This happened to me a few times and I think I mentioned it in a JIRA, but AFAIK there is no separate JIRA for this.
> This is what I did today (verifying JBDS-3739):
> 1. Start my Eclipse Neon RC2
> 2. Updated Eclipse
> 3. Updated Docker Tools to latest nightly
> 4. Installed nightly JBoss Tools Abridged
> 5. Set up cdk server (CDK 2.0 on my disk, already set up and started several times before)
> 6. Start CDK server
> Everything fine here - after some time it's Started, I accepted the OpenShift cert, Docker connection worked.
> 7. Stop CDK server
> 8. Start CDK server
> This time it's stuck on Starting... even though I can see from the console that the vagrant box started:
> {code}
> Bringing machine 'default' up with 'virtualbox' provider...
> ==> default: Clearing any previously set forwarded ports...
> ==> default: Clearing any previously set network interfaces...
> ==> default: Preparing network interfaces based on configuration...
>     default: Adapter 1: nat
>     default: Adapter 2: hostonly
> ==> default: Forwarding ports...
>     default: 22 (guest) => 2222 (host) (adapter 1)
> ==> default: Running 'pre-boot' VM customizations...
> ==> default: Booting VM...
> ==> default: Waiting for machine to boot. This may take a few minutes...
>     default: SSH address: 127.0.0.1:2222
>     default: SSH username: vagrant
>     default: SSH auth method: private key
>     default: Warning: Remote connection disconnect. Retrying...
> ==> default: Machine booted and ready!
> ==> default: Checking for guest additions in VM...
>     default: No guest additions were detected on the base box for this VM! Guest
>     default: additions are required for forwarded ports, shared folders, host only
>     default: networking, and more. If SSH fails on this machine, please install
>     default: the guest additions and repackage the box to continue.
>     default: 
>     default: This is not an error message; everything may continue to work properly,
>     default: in which case you may ignore this message.
> ==> default: Configuring and enabling network interfaces...
> ==> default: Registering box with vagrant-registration...
> ==> default: Copying TLS certificates to /Users/rasp/jbossqa/cdk/cdk/components/rhel/rhel-ose/.vagrant/machines/default/virtualbox/docker
> ==> default: Rsyncing folder: /Users/rasp/jbossqa/cdk/cdk/components/rhel/rhel-ose/ => /vagrant
> ==> default: Machine already provisioned. Run `vagrant provision` or use the `--provision`
> ==> default: flag to force provisioning. Provisioners marked to run always will still run.
> {code}
> Now it will probably time out and stop the server. And most probably next start will work.



--