[jbosstools-issues] [JBoss JIRA] (JBIDE-22604) CDK server adapter stuck at starting
Jan Richter (JIRA)
issues at jboss.org
Wed Jun 15 04:54:00 EDT 2016
Jan Richter created JBIDE-22604:
-----------------------------------
Summary: CDK server adapter stuck at starting
Key: JBIDE-22604
URL: https://issues.jboss.org/browse/JBIDE-22604
Project: Tools (JBoss Tools)
Issue Type: Bug
Components: cdk
Affects Versions: 4.4.0.Final
Environment: development-suite-1.0.0-GA-20160615-188-bundle-installer.exe
devstudio 10.0.0.GA-a
CDK 2.1.RC3
Reporter: Jan Richter
I have installed the development suite using the all-in-1 installer (on 3 different windows machines now). Every time I try to start CDK using the server adapter it gets stuck on 'starting'.
In fact the CDK does start up, openshift is running, but no connection is created + the server adapter is marked as starting and the job (starting CDK) is spinning until it hits the timeout.
Strange thing is - stopping the job/server adapter at this point will first create the desired openshift connection and then CDK wil stop.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
More information about the jbosstools-issues
mailing list