[jbosstools-issues] [JBoss JIRA] (JBIDE-22604) CDK server adapter stuck at starting
Alexey Kazakov (JIRA)
issues at jboss.org
Wed Jun 15 08:28:00 EDT 2016
[ https://issues.jboss.org/browse/JBIDE-22604?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Alexey Kazakov updated JBIDE-22604:
-----------------------------------
Priority: Critical (was: Major)
> CDK server adapter stuck at starting
> ------------------------------------
>
> Key: JBIDE-22604
> URL: https://issues.jboss.org/browse/JBIDE-22604
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: cdk
> Affects Versions: 4.4.0.Final
> Environment: development-suite-1.0.0-GA-20160615-188-bundle-installer.exe
> devstudio 10.0.0.GA-a
> CDK 2.1.RC3
> Reporter: Jan Richter
> Assignee: Rob Stryker
> Priority: Critical
>
> I have installed the development suite using the all-in-1 installer (on 3 different windows machines now). Every time I try to start CDK using the server adapter it gets stuck on 'starting'.
> In fact the CDK does start up, openshift is running, but no connection is created + the server adapter is marked as starting and the job (starting CDK) is spinning until it hits the timeout.
> Strange thing is - stopping the job/server adapter at this point will first create the desired openshift connection and then CDK wil stop.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
More information about the jbosstools-issues
mailing list