[jbosstools-issues] [JBoss JIRA] (JBIDE-22604) CDK server adapter stuck at starting

Len DiMaggio (JIRA) issues at jboss.org
Thu Jun 16 08:59:00 EDT 2016


    [ https://issues.jboss.org/browse/JBIDE-22604?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13253503#comment-13253503 ] 

Len DiMaggio commented on JBIDE-22604:
--------------------------------------

Manual vagrant up works fine with RC2,RC3 and RC4 (with folder sync using vagrant-sshfs). But the issue comes only with devstudio and platform installer where Java program is performing the vagrant up.


> CDK server adapter stuck at starting
> ------------------------------------
>
>                 Key: JBIDE-22604
>                 URL: https://issues.jboss.org/browse/JBIDE-22604
>             Project: Tools (JBoss Tools)
>          Issue Type: Bug
>          Components: cdk, upstream
>    Affects Versions: 4.4.0.Final
>         Environment: development-suite-1.0.0-GA-20160615-188-bundle-installer.exe
> devstudio 10.0.0.GA-a
> CDK 2.1.RC3
>            Reporter: Jan Richter
>            Assignee: Rob Stryker
>            Priority: Blocker
>             Fix For: 4.4.0.Final
>
>
> I have installed the development suite using the all-in-1 installer (on 3 different windows machines now). Every time I try to start CDK using the server adapter it gets stuck on 'starting'.
> In fact the CDK does start up, openshift is running, but no connection is created + the server adapter is marked as starting and the job (starting CDK) is spinning until it hits the timeout. 
> Strange thing is - stopping the job/server adapter at this point will first create the desired openshift connection and then CDK wil stop.



--
This message was sent by Atlassian JIRA
(v6.4.11#64026)


More information about the jbosstools-issues mailing list