[jbosstools-issues] [JBoss JIRA] (JBTIS-602) Fix a test for creating a SY project with intpkg

Andrej Podhradsky (JIRA) issues at jboss.org
Mon Mar 21 15:33:00 EDT 2016


     [ https://issues.jboss.org/browse/JBTIS-602?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Andrej Podhradsky updated JBTIS-602:
------------------------------------
    Summary: Fix a test for creating a SY project with intpkg  (was: Fix creating a SY project with intpkg)


> Fix a test for creating a SY project with intpkg
> ------------------------------------------------
>
>                 Key: JBTIS-602
>                 URL: https://issues.jboss.org/browse/JBTIS-602
>             Project: JBoss Tools Integration Stack
>          Issue Type: Task
>          Components: QE, switchyard
>    Affects Versions: 4.2.6.CR1
>            Reporter: Andrej Podhradsky
>            Assignee: Andrej Podhradsky
>
> The problem is that the behaviour depends eclipse base (luna or mars)
> - detect correct runtime label
> - get rid of switchyard vs integration version



--
This message was sent by Atlassian JIRA
(v6.4.11#64026)


More information about the jbosstools-issues mailing list