[jbosstools-issues] [JBoss JIRA] (JBTIS-602) Fix a test for creating a SY project with intpkg
Andrej Podhradsky (JIRA)
issues at jboss.org
Tue Mar 22 11:25:00 EDT 2016
[ https://issues.jboss.org/browse/JBTIS-602?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Andrej Podhradsky updated JBTIS-602:
------------------------------------
Git Pull Request: https://github.com/jbosstools/jbosstools-integration-stack-tests/pull/664, https://github.com/jbosstools/jbosstools-integration-stack-tests/pull/666, https://gitlab.mw.lab.eng.bos.redhat.com/jbossqe-jbdsis/server-installer/merge_requests/66
> Fix a test for creating a SY project with intpkg
> ------------------------------------------------
>
> Key: JBTIS-602
> URL: https://issues.jboss.org/browse/JBTIS-602
> Project: JBoss Tools Integration Stack
> Issue Type: Task
> Components: QE, switchyard
> Affects Versions: 4.2.6.CR1
> Reporter: Andrej Podhradsky
> Assignee: Andrej Podhradsky
>
> The problem is that the behaviour depends eclipse base (luna or mars)
> - detect correct runtime label
> - get rid of switchyard vs integration version
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
More information about the jbosstools-issues
mailing list