[jbosstools-issues] [JBoss JIRA] (ERT-159) "Run Image" wizard forgets volume paths [EBZ#490366]

Roland Grunberg (JIRA) issues at jboss.org
Tue May 10 12:58:00 EDT 2016


     [ https://issues.jboss.org/browse/ERT-159?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Roland Grunberg resolved ERT-159.
---------------------------------
      Assignee: Roland Grunberg
    Resolution: Done


I haven't had the chance to test this on Windows yet, although I'm fairly certain the solution is correct. I would mark this as closed once fully tested.

> "Run Image" wizard forgets volume paths [EBZ#490366]
> ----------------------------------------------------
>
>                 Key: ERT-159
>                 URL: https://issues.jboss.org/browse/ERT-159
>             Project: Eclipse Release Train
>          Issue Type: Task
>          Components: Linux Tools
>            Reporter: Friendly Jira Robot
>            Assignee: Roland Grunberg
>              Labels: Docker, bzira
>             Fix For: Neon (4.6)
>
>
> Created attachment 260557
> The problem
> On Windows when I try to run an image again, all my inputs are correctly loaded from saved configuration, except valumes' mappings(see attachment). My guess is that run configuration is saved AFTER the paths are transformed(i.e. from C:\your\path to /C/your/path) and when loading the configuration the paths are not transformed back. I was able to confirm that on Mac OS everything works fine.



--
This message was sent by Atlassian JIRA
(v6.4.11#64026)


More information about the jbosstools-issues mailing list