[jbosstools-issues] [JBoss JIRA] (JBTIS-8) JBossTools Integration Stack :: drools: Verify the component configuration of the initial IS tooling release.

Andrej Podhradsky (JIRA) issues at jboss.org
Fri May 13 10:37:01 EDT 2016


     [ https://issues.jboss.org/browse/JBTIS-8?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Andrej Podhradsky closed JBTIS-8.
---------------------------------


Closed as obsolete

> JBossTools Integration Stack :: drools: Verify the component configuration of the initial IS tooling release.
> -------------------------------------------------------------------------------------------------------------
>
>                 Key: JBTIS-8
>                 URL: https://issues.jboss.org/browse/JBTIS-8
>             Project: JBoss Tools Integration Stack
>          Issue Type: Sub-task
>          Components: drools/ jBPM
>         Environment: JBT 4.0
>            Reporter: Paul Leacu
>            Assignee: Kris Verlaenen
>
> Please verify your component configuration of the JBoss Integration Stack for a JBoss Tools 4.0 target.
> Also check that all components are compatible with the upstream components defined in the target platform.
> ref:
> https://github.com/pleacu/jbosstools-integration-stack-proto/blob/master/aggregate-site/site.xml
> https://github.com/pleacu/jbosstools-integration-stack-proto/blob/master/releases/compositeArtifacts.xml - compositeContent.xml
> https://github.com/pleacu/jbosstools-integration-stack-proto/blob/master/target-platform/integration-tools.target
> I'm working on getting this project promoted to jbosstools in github. Unitl then please refer to/fork the urls above. There is a best-guess already specified for each component.



--
This message was sent by Atlassian JIRA
(v6.4.11#64026)


More information about the jbosstools-issues mailing list