[jbosstools-issues] [JBoss JIRA] (JBDS-3890) Devstudio installation takes a long, long time
Jan Richter (JIRA)
issues at jboss.org
Tue May 17 04:00:00 EDT 2016
Jan Richter created JBDS-3890:
---------------------------------
Summary: Devstudio installation takes a long, long time
Key: JBDS-3890
URL: https://issues.jboss.org/browse/JBDS-3890
Project: Red Hat Developer Studio (DevStudio)
Issue Type: Bug
Components: installer
Affects Versions: 10.0.0.Alpha1
Environment: Fedora 22 x64
OpenJDK 1.8.0_91
jboss-devstudio-10.0.0.Alpha1-v20160517-0518-B5370-installer-standalone.jar
Reporter: Jan Richter
Priority: Critical
Attachments: install.png
Some actual data here:
- Alpha1 (staged) build took 2:05 to install on my machine
- Alpha1 nightly (B5370) took 5:15 to install
Around the minute mark the installation just freezes in this state:
!install.png|thumbnail!
Meanwhile the trace says:
{noformat}
Committing the provisioning operation.
Operation completed in 275702 ms.
{noformat}
That is quite a long time it spent doing that operation.
Some jstack info can be found here:
http://pastebin.test.redhat.com/374700
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
More information about the jbosstools-issues
mailing list