[jbosstools-issues] [JBoss JIRA] (JBDS-3890) Devstudio installation takes a long, long time

Jan Richter (JIRA) issues at jboss.org
Thu May 19 03:22:00 EDT 2016


    [ https://issues.jboss.org/browse/JBDS-3890?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13239778#comment-13239778 ] 

Jan Richter commented on JBDS-3890:
-----------------------------------

Happens every time I run it, no matter what I'm running. [~rhopp] has the same issue, so I'm not alone in this either.

> Devstudio installation takes a long, long time
> ----------------------------------------------
>
>                 Key: JBDS-3890
>                 URL: https://issues.jboss.org/browse/JBDS-3890
>             Project: Red Hat Developer Studio (DevStudio)
>          Issue Type: Bug
>          Components: installer
>    Affects Versions: 10.0.0.Alpha1
>         Environment: Fedora 22 x64
> OpenJDK 1.8.0_91
> jboss-devstudio-10.0.0.Alpha1-v20160517-0518-B5370-installer-standalone.jar
>            Reporter: Jan Richter
>            Priority: Critical
>         Attachments: install.png
>
>
> Some actual data here:
>  - Alpha1 (staged) build took 2:05 to install on my machine
>  - Alpha1 nightly (B5370) took 5:15 to install
> Around the minute mark the installation just freezes in this state:
> !install.png|thumbnail!
> Meanwhile the trace says:
> {noformat}
> Committing the provisioning operation.
> Operation completed in 275702 ms.
> {noformat}
> That is quite a long time it spent doing that operation.
> Some jstack info can be found here:
> http://pastebin.test.redhat.com/374700



--
This message was sent by Atlassian JIRA
(v6.4.11#64026)


More information about the jbosstools-issues mailing list