[jbosstools-issues] [JBoss JIRA] (ERT-218) If docker is stopped, loading images will stuck the UI [EBZ#494605]
Friendly Jira Robot (JIRA)
issues at jboss.org
Thu May 26 05:28:02 EDT 2016
Friendly Jira Robot created ERT-218:
---------------------------------------
Summary: If docker is stopped, loading images will stuck the UI [EBZ#494605]
Key: ERT-218
URL: https://issues.jboss.org/browse/ERT-218
Project: Eclipse Release Train
Issue Type: Task
Components: Linux Tools
Reporter: Friendly Jira Robot
If the docker runtime is stopped or the docker connection info is bad (wrong IP), then expanding the images (or containers) displays Loading... and the Eclipse UI is stuck and not responsive anymore
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)
More information about the jbosstools-issues
mailing list