[jbosstools-issues] [JBoss JIRA] (ERT-218) If docker is stopped, loading images will stuck the UI [EBZ#494605]

Roland Grunberg (JIRA) issues at jboss.org
Thu May 26 09:46:00 EDT 2016


     [ https://issues.jboss.org/browse/ERT-218?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Roland Grunberg updated ERT-218:
--------------------------------
    Sprint: devex #115 May 2016


> If docker is stopped, loading images will stuck the UI [EBZ#494605]
> -------------------------------------------------------------------
>
>                 Key: ERT-218
>                 URL: https://issues.jboss.org/browse/ERT-218
>             Project: Eclipse Release Train
>          Issue Type: Task
>          Components: Linux Tools
>            Reporter: Friendly Jira Robot
>              Labels: Docker, bzira
>
> If the docker runtime is stopped or the docker connection info is bad (wrong IP), then expanding the images (or containers) displays Loading... and the Eclipse UI is stuck and not responsive anymore



--
This message was sent by Atlassian JIRA
(v6.4.11#64026)


More information about the jbosstools-issues mailing list