[jbosstools-issues] [JBoss JIRA] (JBIDE-3937) Create Stress JUnit Test Suite withch is included all available JUnit tests from all components

Denis Golovin (JIRA) issues at jboss.org
Mon Oct 17 12:38:00 EDT 2016


    [ https://issues.jboss.org/browse/JBIDE-3937?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13308005#comment-13308005 ] 

Denis Golovin commented on JBIDE-3937:
--------------------------------------

It is not on mine radar. If integration tests are running in the same eclipse session, that would be a fair substitute for what was requested in this issue.

> Create Stress JUnit Test Suite withch is included all available JUnit tests from all components
> -----------------------------------------------------------------------------------------------
>
>                 Key: JBIDE-3937
>                 URL: https://issues.jboss.org/browse/JBIDE-3937
>             Project: Tools (JBoss Tools)
>          Issue Type: Feature Request
>          Components: build, qa
>    Affects Versions: 3.0.0.GA
>            Reporter: Denis Golovin
>            Assignee: Denis Golovin
>             Fix For: 4.3.x
>
>
> Why we need this?
> The Idea is in emulation a long development session. Now all tests suites are ran one by one each in its own session on clean workspace. A longest test suite takes around 15-20 minutes. Such test suite would emulate an about one hour long development session which can help to find memory leaks or other integration problems.
> It should be able to start on selected JBT build. It should download last or selected version of JBT form download site and start Stress Test Suite.



--
This message was sent by Atlassian JIRA
(v6.4.11#64026)


More information about the jbosstools-issues mailing list