[jbosstools-issues] [JBoss JIRA] (JBIDE-24789) Find a way to avoid freeze of master for several days

Nick Boldt (JIRA) issues at jboss.org
Wed Aug 9 13:00:00 EDT 2017


     [ https://issues.jboss.org/browse/JBIDE-24789?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Nick Boldt reassigned JBIDE-24789:
----------------------------------

    Assignee: Jeff MAURY


> Find a way to avoid freeze of master for several days
> -----------------------------------------------------
>
>                 Key: JBIDE-24789
>                 URL: https://issues.jboss.org/browse/JBIDE-24789
>             Project: Tools (JBoss Tools)
>          Issue Type: Task
>          Components: build
>    Affects Versions: 4.5.0.Final
>            Reporter: Aurélien Pupier
>            Assignee: Jeff MAURY
>             Fix For: 4.5.x
>
>
> Currently, for each milestone, final release, the master branch is frozen for several days which is decreasing productivity and increase risk at the end of code freeze (as everybody wants to merge a lot of PRs at the same time)
> it would be nice to find a way to avoid the freeze on the master branch.
> Proposal:
> - create a branch for each milestone/release:
> -- it allows to continue working on master
> -- it allows to provide blocker/critical fix if needed on the branch



--
This message was sent by Atlassian JIRA
(v7.2.3#72005)



More information about the jbosstools-issues mailing list