[jbosstools-issues] [JBoss JIRA] (JBIDE-24485) Refactoring: split release job into two pieces so jbosstools and devstudio can run in parallel to save time
Nick Boldt (JIRA)
issues at jboss.org
Wed Aug 9 16:02:00 EDT 2017
[ https://issues.jboss.org/browse/JBIDE-24485?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Nick Boldt updated JBIDE-24485:
-------------------------------
Sprint: devex #132 May 2017, devex #136 August 2018 (was: devex #132 May 2017, devex #135 July 2017)
> Refactoring: split release job into two pieces so jbosstools and devstudio can run in parallel to save time
> -----------------------------------------------------------------------------------------------------------
>
> Key: JBIDE-24485
> URL: https://issues.jboss.org/browse/JBIDE-24485
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: build
> Affects Versions: 4.5.0.AM1
> Reporter: Nick Boldt
> Assignee: Nick Boldt
> Labels: releasework
> Fix For: 4.5.0.Final
>
>
> Should split release job [1] into two pieces so jbosstools and devstudio can run in parallel to save time.
> [1] https://dev-platform-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/job/jbosstools-releng-push-to-dev-stable-02-copy-builds-and-update-sites/
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
More information about the jbosstools-issues
mailing list