[jbosstools-issues] [JBoss JIRA] (JBIDE-23567) Integration tests global refactoring
Martin Malina (JIRA)
issues at jboss.org
Mon Feb 6 05:10:00 EST 2017
[ https://issues.jboss.org/browse/JBIDE-23567?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Martin Malina updated JBIDE-23567:
----------------------------------
Fix Version/s: 4.4.3.Final
(was: 4.4.3.AM2)
> Integration tests global refactoring
> ------------------------------------
>
> Key: JBIDE-23567
> URL: https://issues.jboss.org/browse/JBIDE-23567
> Project: Tools (JBoss Tools)
> Issue Type: Task
> Components: integration-tests
> Reporter: Jeff MAURY
> Labels: integration-test, integration_tests
> Fix For: 4.4.3.Final
>
>
> We should done some work on integration tests so that we can rely on them to improve our code quality and reduce the technical debt.
> A sprint will be dedicated.
> Here are the tasks we should work on:
> * run tests from Maven and document how to run them if specific steps are required
> * If failure, fix the failed tests
> * Refactor / move tests to the components repository
> * Fix/make sure tests are run in PR check
> This huge task should be done component per component. Sub-tasks JIRA will be created for each component.
> You can use this document as a starting point:[https://docs.google.com/document/d/1bl8pJ2aW65UpyGpr3qxoAUREDWL26NM73F6AFF2xoe8/edit]
--