Mickael Istria resolved JBIDE-23889.
------------------------------------
Resolution: Done
Build #27718 took place on Feb 8th, and job has looped failing at very high frequency (several times per minutes whereas expectation is every 30 minutes) for at least 2 days, until Build #29675. That is about ~2000 builds in two days.
But it seems that the delay of 30 minutes is working properly again, so this issue seems fixed magically.
> jbosstools-composite-install_master sends lots of nag emails when something goes awry (as it should)
> ----------------------------------------------------------------------------------------------------
>
> Key: JBIDE-23889
> URL: https://issues.jboss.org/browse/JBIDE-23889
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: build
> Affects Versions: 4.4.3.AM2
> Reporter: Mickael Istria
> Assignee: Mickael Istria
> Fix For: 4.4.4.AM1
>
> Attachments: composite.png
>
>
> jbosstools-composite-install_master re-runs itself on failure. However, it seems like the SLEEP_TIME parameter is now ignored, resulting on constant re-run of the job and a lot of spam (multiple mails per minutes). Additionally to spam, this adds a relatively big load on Jenkins and slaves queue.
> I've removed the re-run on failure block of the downstream job trigger as a temporary workaround.
--