[jbosstools-issues] [JBoss JIRA] (JBIDE-24485) split release job into two pieces so jbosstools and devstudio can run in parallel to save time

Nick Boldt (JIRA) issues at jboss.org
Wed Jul 19 10:53:00 EDT 2017


     [ https://issues.jboss.org/browse/JBIDE-24485?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Nick Boldt updated JBIDE-24485:
-------------------------------
    Sprint: devex #132 May 2017, devex #135 July 2017  (was: devex #132 May 2017)


> split release job into two pieces so jbosstools and devstudio can run in parallel to save time
> ----------------------------------------------------------------------------------------------
>
>                 Key: JBIDE-24485
>                 URL: https://issues.jboss.org/browse/JBIDE-24485
>             Project: Tools (JBoss Tools)
>          Issue Type: Bug
>          Components: build
>    Affects Versions: 4.5.0.AM1
>            Reporter: Nick Boldt
>            Assignee: Nick Boldt
>             Fix For: 4.5.0.Final
>
>
> Should split release job [1] into two pieces so jbosstools and devstudio can run in parallel to save time.
> [1] https://dev-platform-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/job/jbosstools-releng-push-to-dev-stable-02-copy-builds-and-update-sites/



--
This message was sent by Atlassian JIRA
(v7.2.3#72005)


More information about the jbosstools-issues mailing list