[jbosstools-issues] [JBoss JIRA] (JBDS-4343) Installation hangs on 'Configuring toolingorg.eclipse.equinox.launcher.*'
Andrej Podhradsky (JIRA)
issues at jboss.org
Fri Jul 21 08:31:00 EDT 2017
[ https://issues.jboss.org/browse/JBDS-4343?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13438709#comment-13438709 ]
Andrej Podhradsky commented on JBDS-4343:
-----------------------------------------
This seems to be fixed in Devstudio 11.0.0.AM2. The installation takes about 2 minutes 20 seconds.
> Installation hangs on 'Configuring toolingorg.eclipse.equinox.launcher.*'
> -------------------------------------------------------------------------
>
> Key: JBDS-4343
> URL: https://issues.jboss.org/browse/JBDS-4343
> Project: Red Hat JBoss Developer Studio (devstudio)
> Issue Type: Bug
> Components: installer
> Affects Versions: 10.4.0.AM2
> Environment: devstudio-10.4.0.AM2-v20170330-1543-B348-installer-standalone.jar
> Reporter: Jan Richter
> Assignee: Denis Golovin
> Labels: performance
> Fix For: 11.0.0.GA
>
> Attachments: install.png
>
>
> The installer spends several minutes in this state:
> !install.png|thumbnail!
> Just for comparison
> - AM1 installation takes total of about 2 minutes 15 seconds
> - AM2 takes 5 minutes 40 seconds
> There is no shortage of memory or disk I/O availability, the CPU is not topped off (even though AM2 eats up more CPU itself during this time).
> DTRACE=true reveals nothing interesting really, this is what it says in the particular moment (notice how much time the operation takes):
> {noformat}
> Configuring toolingorg.eclipse.equinox.launcher.gtk.linux.x86_64
> Preparing to commit the provisioning operation.
> Committing the provisioning operation.
> Operation completed in 289855 ms.
> {noformat}
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
More information about the jbosstools-issues
mailing list