[jbosstools-issues] [JBoss JIRA] (JBIDE-24079) baseline check should be bound to package phase
Jeff MAURY (JIRA)
issues at jboss.org
Mon Mar 13 10:42:03 EDT 2017
Jeff MAURY created JBIDE-24079:
----------------------------------
Summary: baseline check should be bound to package phase
Key: JBIDE-24079
URL: https://issues.jboss.org/browse/JBIDE-24079
Project: Tools (JBoss Tools)
Issue Type: Bug
Components: build
Affects Versions: 4.4.4.AM1, 4.5.0.AM1
Reporter: Jeff MAURY
Fix For: 4.4.4.AM2, 4.5.0.AM1
The baseline check is currently bound to the verify phase. It would be more convenient to have it bound to the package phase. I think this can be done in the parent POM, not using the default phase
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
More information about the jbosstools-issues
mailing list