[jbosstools-issues] [JBoss JIRA] (JBIDE-24005) Prepare a GREEN jenkins job for integration of devstudio with cdk3 test
Ondrej Dockal (JIRA)
issues at jboss.org
Wed Mar 15 11:03:00 EDT 2017
[ https://issues.jboss.org/browse/JBIDE-24005?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Ondrej Dockal updated JBIDE-24005:
----------------------------------
Fix Version/s: 4.4.4.AM2
> Prepare a GREEN jenkins job for integration of devstudio with cdk3 test
> -----------------------------------------------------------------------
>
> Key: JBIDE-24005
> URL: https://issues.jboss.org/browse/JBIDE-24005
> Project: Tools (JBoss Tools)
> Issue Type: Task
> Components: integration-tests, qa
> Affects Versions: 4.4.4.AM1
> Reporter: Ondrej Dockal
> Assignee: Ondrej Dockal
> Labels: cdk, integration_tests, jenkins
> Fix For: 4.4.4.AM2
>
>
> Automated tests for devstudio server adapter with cdk3 run on jenkins.
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
More information about the jbosstools-issues
mailing list