[jbosstools-issues] [JBoss JIRA] (JBIDE-24079) baseline check should be bound to package phase
Nick Boldt (JIRA)
issues at jboss.org
Thu Mar 16 14:38:00 EDT 2017
[ https://issues.jboss.org/browse/JBIDE-24079?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13379951#comment-13379951 ]
Nick Boldt commented on JBIDE-24079:
------------------------------------
Must revert this change as it breaks builds -- need to ensure ALL packaging steps are done before doing these checks. "JBIDE-24079 bind baseline check and enforcer checks to package phase"
> baseline check should be bound to package phase
> -----------------------------------------------
>
> Key: JBIDE-24079
> URL: https://issues.jboss.org/browse/JBIDE-24079
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: build
> Affects Versions: 4.4.4.AM1, 4.5.0.AM1
> Reporter: Jeff MAURY
> Assignee: Nick Boldt
> Labels: build, check
> Fix For: 4.4.4.AM2, 4.5.0.AM1
>
>
> The baseline check is currently bound to the verify phase. It would be more convenient to have it bound to the package phase. I think this can be done in the parent POM, not using the default phase
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
More information about the jbosstools-issues
mailing list